Eligibility stage
The eligibility page lists the program's own criteria (E1 to E6 for Power Transformer, H1 to H7 for the WA Hub). Each is a lookup (confirmed from the ABR), a declaration, a threshold (such as headcount) or an attachment.
- Declared stage. Choose the Churchill & Lewis stage that best describes your company. Every module is scored against the band expected for this stage; your Commercialisation Manager can later confirm or challenge it.
- Save and exit keeps a draft. Submit eligibility requires every criterion answered; a stage cannot be submitted with an incomplete page.
- Threshold rules are auto-checked and the result goes to the Delegate for verification; nothing is auto-declined.
- Clarification requested re-opens only the named pages; submit again when done.
- Withdraw is available from the metro map at every station before a decision, with a reason.
After submission the application is read-only and the metro map shows "With Powering Australia".